Sunday, August 5, 2012

Rain, Rain, Don't Go Away: Green Infrastructure in Buffalo

We had a torrential downpout here in Buffalo today. Many people were happy about the rain because it has been very hot here of late, and weeks without rain has led to the death of many lawns and gardens. I was excited for a different reason. It was the first big test of our new street! I am lucky enough to live on the first test block for porous asphalt in Buffalo. My neighbors and I are quite excited about it even though it took two months for them to install it. The difference was pretty awesome. My three year old and I ran around in the rain, and watcedh it all just seep into the street. Rumor has it that we will also be getting free rain barrels.

There are a lot of exciting green infrastructure projects around the country. Having lived through one of them, I think there is a lot of potential. But it took 2 months for them to do one block here in Buffalo. Wonder how much time and money it would take to do a significant part of the city?

Jessica Owley

https://lawprofessors.typepad.com/land_use/2012/08/rain-rain-dont-go-away-green-infrastructure-in-buffalo.html

Local Government, Sustainability, Urbanism, Water | Permalink

TrackBack URL for this entry:

https://www.typepad.com/services/trackback/6a00d8341bfae553ef01676915793e970b

Listed below are links to weblogs that reference Rain, Rain, Don't Go Away: Green Infrastructure in Buffalo:

Comments

ooh and the mayor came by today to test it out: http://www.buffalorising.com/2012/08/buffalos-pervious-pavement-project.html

Posted by: Jessie Owley | Aug 6, 2012 12:23:15 PM